To ensure a seamless installation and commissioning, we manage every aspect of an installation from the start of the project right through to the commissioning and testing. This can include the delivery of units, crane hire, full risk and method statements, cabling, and commissioning.
We design and build electrical control panels in house for standby generators, synchronising schemes, battery storage and hybrid systems. That includes AMF and changeover panels, generator synchronising panels, multi set load sharing panels, BESS and solar control panels, and PLC and SCADA panels for remote monitoring. Every panel is built to your site drawings, wired, labelled and tested before it leaves us.
Most of our panels are built around ComAp controllers, including InteliGen, InteliSys and InteliMains. We configure, program and commission them ourselves, and we upgrade older panels and other controller brands to ComAp. Recent work includes ComAp upgrades across a STOR generation fleet and G99 settings on a 20MW site. See our ComAp specialists page.
We service and fault find control panels on site, replace obsolete controllers and add remote monitoring. Panels can be included in a generator service agreement with 24/7 callout. For full scheme design see control panel design and build, SCADA development and complex power control schemes.
Call 0114 317 7939 or email support@pcasltd.com for a control panel quote.
At PCAS Ltd., we have a collective experience of over 50 years working within critical power solutions across most industries.
No matter which service you’re looking for, our team can provide a start-to-finish solution, including design, installation, and testing.
We use a range of hardware from industry-leading manufacturers and providers, offering solutions for all areas.
We’re a Sheffield-based company with national capabilities, employing modern remote monitoring services.

The installation was a full turnkey project, which included all the required building and civil works, which consisted of installing and commissioning 2 x 440 kVA generators with a 6,000-litre fuel tank and a fuel polishing machine.
This was handed over in January 2019.

The installation of this site in the northwest of the UK consisted of 12 x 500 kVA sets and 2 x 20000 litre tanks. Complete G59 testing, fuel system design, and remote monitoring.
The site was handed over to the customer in January 2018.
Our teams are headed up by Stuart and Nik Morley, who have a collective 50 years of experience in the power control, communications, and automation industries.
Our experience is our greatest asset and has allowed us to grow our company and reputation organically. Our independently run organisation allows for maximum flexibility during project delivery.
We welcome conversations with consultants, manufacturers, design and build companies, mechanical engineering companies, planners, project managers, and anybody requiring critical power solutions.