Selby’s industrial sites, distribution parks at Sherburn and Eggborough, and food and energy businesses along the A19 and A63 all depend on standby power.
PCAS services generators across the Selby district and upgrades the control panels that run them, with a 24/7 emergency callout line on every agreement.
Generator control panel upgrade to a ComAp ATS system. A Selby site’s generator controls had become obsolete. PCAS stripped out the old controls and installed a new ComAp automatic transfer switch (ATS) control system, so the site now changes over to standby power and back automatically, with clear alarms and event logs.
Selby, Sherburn in Elmet, Tadcaster, Snaith, Drax, Eggborough, Thorpe Willoughby, Riccall and Howden.
Every plan includes our 24/7 callout line. Compare the service plans
Call 0114 317 7939 or email support@pcasltd.com for a Selby quote.
Our teams are headed up by Stuart and Nik Morley, who have a collective 50 years of experience in the power control, communications, and automation industries.
Our experience is our greatest asset and has allowed us to grow our company and reputation organically. Our independently run organisation allows for maximum flexibility during project delivery.
We welcome conversations with consultants, manufacturers, design and build companies, mechanical engineering companies, planners, project managers, and anybody requiring critical power solutions.